QUESTION NO.- 1 Material M is used to produced a toy. It was budgeted that each toy will require 5 kg. of material @ Rs. 9 per kg. During a month 500 pieces of toy was produced using 2,400 kg. material purchased at Rs. 25,000. Calculate material variances.
Answer: Standard Quantity for actual production (\(SQ\)) = \(500 \times 5 = 2,500\) kg
Standard Price (\(SP\)) = Rs. 9 per kg
Actual Quantity (\(AQ\)) = \(2,400\) kg
Actual Price (\(AP\)) = \(\frac{25,000}{2,400} =\) Rs. \(10.4167\) per kg
1. Material Cost Variance (\(MCV\)) = \((SQ \times SP) - (AQ \times AP) = (2,500 \times 9) - 25,000 = 22,500 - 25,000 =\) Rs. \(2,500\) (Adverse)
2. Material Price Variance (\(MPV\)) = \(AQ(SP - AP) = 2,400(9 - 10.4167) =\) Rs. \(3,400\) (Adverse)
3. Material Usage Variance (\(MUV\)) = \(SP(SQ - AQ) = 9(2,500 - 2,400) =\) Rs. \(900\) (Favourable)
In simple words: Material variances compare what the material cost should have been for the actual production against what it actually cost.
Exam Tip: Always verify that Material Cost Variance equals the sum of Material Price Variance and Material Usage Variance (\(MCV = MPV + MUV\)).
QUESTION NO.- 2 A Co. Ltd. mannfactures a particular product the standard cost of which is as under: (Calculate variances):
| Material | Units | Price | Amount |
|---|---|---|---|
| M1 | 100 | 2.00 | Rs. 200 |
| M2 | 200 | 1.70 | Rs. 340 |
| Less Normal wastage | -30 | - | -- |
| Production | 270 | - | Rs. 540 |
| Actual results in a period were as follows: | |||
|---|---|---|---|
| Material | Units | Price | Amount |
| M1 | 215 | 1.80 | Rs. 387 |
| M2 | 385 | 2.00 | Rs. 770 |
| Total | 600 | - | Rs. 1,157 |
| Less wastage | -70 | - | - |
| Production | 530 | - | Rs. 1,157 |
Answer: Standard mix ratio: M1 = 100 units, M2 = 200 units (Total input = 300 units, Output = 270 units, Normal Loss = 30 units or 10%).
Standard Cost per unit of output = \(\frac{540}{270} =\) Rs. 2.
For actual output of 530 units:
Standard Input required = \(\frac{300}{270} \times 530 = 588.89\) units.
Standard Quantity for M1 = \(\frac{100}{300} \times 588.89 = 196.30\) units; Standard Price = Rs. 2.00.
Standard Quantity for M2 = \(\frac{200}{300} \times 588.89 = 392.59\) units; Standard Price = Rs. 1.70.
Actual Input: M1 = 215 units @ Rs. 1.80 = Rs. 387; M2 = 385 units @ Rs. 2.00 = Rs. 770 (Total Input = 600 units).
1. Material Cost Variance = Standard Cost for actual output - Actual Cost = \((530 \times 2) - 1,157 = 1,060 - 1,157 =\) Rs. \(97\) (Adverse).
2. Material Price Variance = \(\sum AQ(SP - AP)\):
For M1: \(215(2.00 - 1.80) = +43\) (Fav)
For M2: \(385(1.70 - 2.00) = -115.5\) (Adv)
Total MPV = \(43 - 115.5 =\) Rs. \(72.50\) (Adverse).
3. Material Usage Variance = \(\sum SP(SQ - AQ)\):
For M1: \(2.00(196.30 - 215) = -37.40\) (Adv)
For M2: \(1.70(392.59 - 385) = +12.90\) (Fav)
Total MUV = \(-37.40 + 12.90 =\) Rs. \(24.50\) (Adverse).
In simple words: When multiple materials are used in a standard mix, usage and price variances are calculated for each material separately and then summed up.
Exam Tip: Pay close attention to normal loss percentages when determining standard quantities for actual output.
QUESTION NO.- 3 The standard set for a chemical mixture of a firm is:
| Material | Standard Mix | St. Price per tonne |
|---|---|---|
| A | 40% | Rs. 20 |
| B | 60% | Rs. 30 |
The standard loss is 10 per cent. During a period 182 tonnes of output were produced from A 90 tonnes (Rs. 18 per tonne) and B 110 tonnes (Rs. 34 per tonne). Calculate variances.
Answer: Actual Output = 182 tonnes.
Standard Loss = 10% of input. Therefore, Output = 90% of Input.
Standard Input required for 182 tonnes output = \(\frac{182}{0.90} = 202.22\) tonnes.
Standard Quantities for actual output:
Material A = \(40\% \text{ of } 202.22 = 80.89\) tonnes @ Rs. 20
Material B = \(60\% \text{ of } 202.22 = 121.33\) tonnes @ Rs. 30
Actual Input: A = 90 tonnes @ Rs. 18; B = 110 tonnes @ Rs. 34 (Total Actual Input = 200 tonnes).
1. Material Price Variance = \(\sum AQ(SP - AP)\):
A: \(90(20 - 18) = +180\) (Fav)
B: \(110(30 - 34) = -440\) (Adv)
Total MPV = \(180 - 440 =\) Rs. \(260\) (Adverse).
2. Material Usage Variance = \(\sum SP(SQ - AQ)\):
A: \(20(80.89 - 90) = -182.2\) (Adv)
B: \(30(121.33 - 110) = +339.9\) (Fav)
Total MUV = \(-182.2 + 339.9 =\) Rs. \(157.7\) (Favourable).
3. Material Cost Variance = \(MCV = MPV + MUV = -260 + 157.7 =\) Rs. \(102.3\) (Adverse).
In simple words: Material variances for chemical mixtures account for standard input-output ratios and percentage mixes.
Exam Tip: Always derive standard input from actual output using the normal loss percentage before calculating standard quantities.
QUESTION NO.- 4 A Co. manufactures a special tile of 12" x 8" x 1/2" size. The standard mix of material used is as follows: 1200 kgs A @ 30p. per kg, 500 kg B @ 60 paise per kg and 800 kg C @ 70p per kg. The mix should produce 12,000 square feet of tiles. During a period 1,00,000 tiles were produced from a mix of 7,000 kg A (paise 32 per kg,) 3,000 kg, B (paise 65 per kg) and 5,000 kg. C (paise 75 per kg.) Compute variances.
Answer: Standard Mix Input = \(1,200 + 500 + 800 = 2,500\) kg producing 12,000 sq. ft.
Size of one tile = \(12^{\prime\prime} \times 8^{\prime\prime} = 96\) sq. inches = \(\frac{96}{144} = \frac{2}{3}\) sq. ft.
Actual production = \(1,00,000\) tiles = \(1,00,000 \times \frac{2}{3} = 66,666.67\) sq. ft.
Standard input required for \(66,666.67\) sq. ft. = \(\frac{2,500}{12,000} \times 66,666.67 = 13,888.89\) kg.
Standard quantities in standard proportion:
A = \(\frac{1,200}{2,500} \times 13,888.89 = 6,666.67\) kg @ Re. \(0.30$
B = \(\frac{500}{2,500} \times 13,888.89 = 2,777.78\) kg @ Re. \(0.60$
C = \(\frac{800}{2,500} \times 13,888.89 = 4,444.44\) kg @ Re. \(0.70$
Actual Input: A = 7,000 kg @ Rs. 0.32; B = 3,000 kg @ Rs. 0.65; C = 5,000 kg @ Rs. 0.75.
1. Material Price Variance = \(\sum AQ(SP - AP)\):
A: \(7,000(0.30 - 0.32) = -140\)
B: \(3,000(0.60 - 0.65) = -150\)
C: \(5,000(0.70 - 0.75) = -250\)
Total MPV = Rs. \(540\) (Adverse).
2. Material Usage Variance = \(\sum SP(SQ - AQ)\):
A: \(0.30(6,666.67 - 7,000) = -100\)
B: \(0.60(2,777.78 - 3,000) = -133.33\)
C: \(0.70(4,444.44 - 5,000) = -388.89\)
Total MUV = Rs. \(622.22\) (Adverse).
3. Material Cost Variance = \(MPV + MUV = -540 - 622.22 =\) Rs. \(1,162.22\) (Adverse).
In simple words: Convert all units to a common measurement base (square feet) before computing standard quantities and variances.
Exam Tip: Carefully convert square inches to square feet using the factor of 144.
QUESTION NO.- 5 Skilled labour is used to produced a toy. It was budgeted that each toy will require three hours of skilled labour @ Rs. 10 per hour. During a month 500 pieces of toy was produced using 1600 hours of skilled labour by paying Rs. 15,000. Calculate labour variances.
Answer: Standard Hours for actual production (\(SH\)) = \(500 \times 3 = 1,500\) hours.
Standard Rate (\(SR\)) = Rs. 10 per hour.
Actual Hours (\(AH\)) = \(1,600\) hours.
Actual Rate (\(AR\)) = \(\frac{15,000}{1,600} =\) Rs. \(9.375\) per hour.
1. Labour Cost Variance (\(LCV\)) = \((SH \times SR) - (AH \times AR) = (1,500 \times 10) - 15,000 = 15,000 - 15,000 =\) Rs. \(0\) (NIL).
2. Labour Rate Variance (\(LRV\)) = \(AH(SR - AR) = 1,600(10 - 9.375) =\) Rs. \(1,000\) (Favourable).
3. Labour Efficiency Variance (\(LEV\)) = \(SR(SH - AH) = 10(1,500 - 1,600) =\) Rs. \(1,000\) (Adverse).
In simple words: Labour variances measure the difference between standard labour cost and actual labour cost due to wage rate changes and time efficiency.
QUESTION NO.- 6 A gang of workers normally consists of 30 men, 15 women and 10 boys. The standard hourly rates are - Men: 80p, Women: 60p, and boys: 40p. In a normal week of 40 hours, the gang is expected to produce 2000 units of output. During the week ended 31st December, 1983, the gang consisted of 40 men, 10 women and 5 boys. The actual wage rates were 70p, 65p and 30p respectively. 4 hours were lost due to power breakdown. Actual output 1600 units. Compute gang composition variance and other variances.
Answer: Normal gang composition: 30 Men, 15 Women, 10 Boys = Total 55 workers.
Standard hours for normal week of 40 hours = \(55 \times 40 = 2,200\) hours for 2,000 units.
Standard hours per unit = \(\frac{2,200}{2,000} = 1.1\) hours.
For actual output of 1,600 units, standard hours required (\(SH\)) = \(1,600 \times 1.1 = 1,760\) hours.
Standard mix proportion: Men = \(\frac{30}{55}\), Women = \(\frac{15}{55}\), Boys = \(\frac{10}{55}\).
Standard hours for actual output (revised standard hours):
Men = \(1,760 \times \frac{30}{55} = 960\) hrs @ Re. 0.80
Women = \(1,760 \times \frac{15}{55} = 480\) hrs @ Re. 0.60
Boys = \(1,760 \times \frac{10}{55} = 320\) hrs @ Re. 0.40
Actual hours worked (excluding idle time):
Total actual workers: 40 Men, 10 Women, 5 Boys = 55 workers.
Gross actual hours paid = \(55 \times 40 = 2,200\) hours.
Idle time = 4 hours per worker for 55 workers = 220 hours.
Net actual hours worked (\(AH\)) = \(2,200 - 220 = 1,980\) hours.
Actual hours worked by category:
Men = \(40 \times (40 - 4) = 1,440\) hrs @ Re. 0.70
Women = \(10 \times (40 - 4) = 360\) hrs @ Re. 0.65
Boys = \(5 \times (40 - 4) = 180\) hrs @ Re. 0.30
1. Labour Rate Variance = \(\sum AH(SR - AR)\):
Men: \(1,440(0.80 - 0.70) = +144\)
Women: \(360(0.60 - 0.65) = -18\)
Boys: \(180(0.40 - 0.30) = +18\)
Total LRV = Rs. \(144\) (Favourable).
2. Idle Time Variance = Idle Hours \(\times SR\):
Men: \(40 \times 4 \times 0.80 = 128\) (Adv)
Women: \(10 \times 4 \times 0.60 = 24\) (Adv)
Boys: \(5 \times 4 \times 0.40 = 8\) (Adv)
Total Idle Time Variance = Rs. \(160\) (Adverse).
3. Labour Efficiency Variance (using net hours) = \(\sum SR(SH - AH)\):
Men: \(0.80(960 - 1,440) = -384\)
Women: \(0.60(480 - 360) = +72\)
Boys: \(0.40(320 - 180) = +56\)
Total LEV = Rs. \(256\) (Adverse).
In simple words: When gang composition and idle time are involved, labour variance is split into rate, idle time, mix, and efficiency components.
Exam Tip: Deduct idle time from gross hours to find actual hours worked for efficiency calculations.
QUESTION NO.- 7 A gang of workers normally consists of 10 skilled, 5 semi-skilled and 5 unskilled workers paid at standard hourly rates of 75p, 50p and 40p respectively. In a normal working week of 40 hours the gang is expected to produce 1000 units of output. In a certain week, the gang consisted of 13 skilled, 4 semi-skilled and 3 unskilled workers and produced 1000 units. Actual wages Rs. 450. Actual hours worked 720. Assuming that each worker worked the same...
Answer: Standard output = 1,000 units. Actual output = 1,000 units. Therefore, Efficiency Variance due to output level is zero.
Standard gang composition: 10 Skilled, 5 Semi-skilled, 5 Unskilled = 20 workers.
Standard hours for normal week = \(20 \times 40 = 800\) hours.
Standard mix ratio: Skilled = \(\frac{10}{20} = 0.5\), Semi-skilled = \(\frac{5}{20} = 0.25\), Unskilled = \(\frac{5}{20} = 0.25\).
Standard rates: Skilled = Re. 0.75, Semi-skilled = Re. 0.50, Unskilled = Re. 0.40.
Actual gang composition: 13 Skilled, 4 Semi-skilled, 3 Unskilled = 20 workers.
Total actual hours worked = 720 hours (given), meaning each worker worked \(\frac{720}{20} = 36\) hours.
Actual hours by category: Skilled = \(13 \times 36 = 468\) hrs, Semi-skilled = \(4 × 36 = 144\) hrs, Unskilled = \(3 \times 36 = 108\) hrs.
Total standard hours for actual output (800 hours total allocated in standard ratio):
Skilled = \(800 \times 0.5 = 400\) hrs @ Re. 0.75
Semi-skilled = \(800 \times 0.25 = 200\) hrs @ Re. 0.50
Unskilled = \(800 \times 0.25 = 200\) hrs @ Re. 0.40
Actual wages total = Rs. 450 (Average actual rate = \(\frac{450}{720} =\) Rs. \(0.625\) per hour).
1. Labour Mix Variance (Gang Composition Variance) = \(\sum SR(RSH - AH)\):
Skilled: \(0.75(400 - 468) = -51\)
Semi-skilled: \(0.50(200 - 144) = +28\)
Unskilled: \(0.40(200 - 108) = +36.8\)
Total Mix Variance = \(-51 + 28 + 36.8 =\) Rs. \(13.8\) (Favourable).
2. Labour Sub-Efficiency Variance = \(\sum SR(SH - RSH)\):
Skilled: \(0.75(400 - 400) = 0\)
Total Sub-Efficiency Variance = Rs. \(0\) (since actual output equals standard output and total actual hours equals standard hours adjusted for mix).
In simple words: Gang composition variance measures the financial effect of changing the proportion of skilled and unskilled workers.
Exam Tip: Standard hours must be apportioned in the standard ratio when calculating mix variances.
QUESTION NO.- 8 The standard and actual labour engaged are under:
| Skilled | Semi-skilled | Unskilled | |
|---|---|---|---|
| Standard No. of Workers | 32 | 12 | 6 |
| Standard Hourly Rate (Rs.) | 3 | 2 | 1 |
| Actual No. of Workers | 28 | 18 | 4 |
| Actual Hourly Rate (Rs.) | 4 | 3 | 2 |
During the 40 hour working week, the gang produced 1800 standard labour hours of work. Compute variances.
Answer: Standard gang total workers = \(32 + 12 + 6 = 50\) workers. Standard hours for 40 weeks = \(50 \times 40 = 2,000\) standard hours.
Standard production achieved = 1,800 standard labour hours.
Standard hours apportioned for 1,800 standard hours output:
Skilled = \(1,800 \times \frac{32}{50} = 1,152\) hrs @ Rs. 3
Semi-skilled = \(1,800 \times \frac{12}{50} = 432\) hrs @ Rs. 2
Unskilled = \(1,800 \times \frac{6}{50} = 216\) hrs @ Rs. 1
Actual hours worked (\(AH\)) for 40 hours week:
Skilled = \(28 \times 40 = 1,120\) hrs @ Rs. 4
Semi-skilled = \(18 \times 40 = 720\) hrs @ Rs. 3
Unskilled = \(4 \times 40 = 160\) hrs @ Rs. 2
Total Actual Hours = \(1,120 + 720 + 160 = 2,000\) hours.
1. Labour Rate Variance = \(\sum AH(SR - AR)\):
Skilled: \(1,120(3 - 4) = -1,120\)
Semi-skilled: \(720(2 - 3) = -720\)
Unskilled: \(160(1 - 2) = -160\)
Total LRV = Rs. \(2,000\) (Adverse).
2. Labour Efficiency Variance = \(\sum SR(SH - AH)\):
Skilled: \(3(1,152 - 1,120) = +96\)
Semi-skilled: \(2(432 - 720) = -576\)
Unskilled: \(1(216 - 160) = +56\)
Total LEV = \(96 - 576 + 56 =\) Rs. \(424\) (Adverse).
3. Labour Cost Variance = \(LRV + LEV = -2,000 - 424 =\) Rs. \(2,424\) (Adverse).
In simple words: Compare standard hours allowed for the output produced against actual hours worked at standard rates.
Exam Tip: Ensure standard hours are scaled down to match the actual standard hours of work produced.
QUESTION NO.- 9 Compute variable overhead variances from following: Budgeted production 300 units Budgeted VO Rs. 7800. Actual production 250 units. Actually VO Rs. 7000. Actual time 4500 hours. Standard time for one unit: 20 hours.
Answer: Budgeted Production = 300 units, Budgeted Variable Overhead = Rs. 7,800.
Standard Variable Overhead Rate per hour (\(SR\)) = Budgeted VO / Budgeted Hours.
Budgeted Hours = \(300 \text{ units} \times 20 \text{ hrs/unit} = 6,000\) hours.
\(SR = \frac{7,800}{6,000} =\) Rs. \(1.30\) per hour.
Actual Production = 250 units. Standard Hours for Actual Production (\(SH\)) = \(250 \times 20 = 5,000\) hours.
Actual Variable Overhead (\(AVO\)) = Rs. 7,000. Actual Hours (\(AH\)) = 4,500 hours.
1. Variable Overhead Cost Variance = Standard Variable Overhead for Actual Output - Actual Variable Overhead
\(= (SH \times SR) - AVO = (5,000 \times 1.30) - 7,000 = 6,500 - 7,000 =\) Rs. \(500\) (Adverse).
2. Variable Overhead Expenditure Variance = \(AH(SR - Actual\ Rate) = AH(SR) - AVO\) (where Actual Rate = \(\frac{7,000}{4,500} = 1.555\)):
\(= (4,500 \times 1.30) - 7,000 = 5,850 - 7,000 =\) Rs. \(1,150\) (Adverse).
3. Variable Overhead Efficiency Variance = \(SR(SH - AH) = 1.30(5,000 - 4,500) = 1.30 \times 500 =\) Rs. \(650\) (Favourable).
In simple words: Variable overhead variances measure spending efficiency and time utilization relative to production output.
Exam Tip: Variable Overhead Cost Variance equals the sum of Expenditure Variance and Efficiency Variance.
QUESTION NO.- 10 Data for February 1983 of a Co., using standard costing are: Actual days worked 22. Actual men hours worked during the month 8600. Actual production 850 units. Actual FO Rs. 3600. The following information is obtained from budget and standard cost data: Budgeted no. of days 20. Budgeted men hours for February: 8000. Standard men hours per unit: 10. F.O. per man hours: 50 paise.
Answer: Budgeted days = 20, Actual days = 22.
Budgeted hours = 8,000. Actual hours = 8,600.
Standard rate per hour (\(SR\) or Fixed Overhead Rate) = Rs. 0.50 per hour.
Standard hours for actual production (\(SH\)) = \(850 \text{ units} \times 10 \text{ hrs/unit} = 8,500\) hours.
Budgeted fixed overhead (\(BFO\)) = \(8,000 \text{ hrs} \times 0.50 =\) Rs. 4,000.
Actual Fixed Overhead (\(AFO\)) = Rs. 3,600.
Standard Fixed Overhead (\(SFO\)) = \(SH \times SR = 8,500 \times 0.50 =\) Rs. 4,250.
1. Fixed Overhead Cost Variance = \(SFO - AFO = 4,250 - 3,600 =\) Rs. \(650\) (Favourable).
2. Fixed Overhead Expenditure Variance = \(BFO - AFO = 4,000 - 3,600 =\) Rs. \(400\) (Favourable).
3. Fixed Overhead Volume Variance = \(SR(SH - Budgeted\ Hours) = 0.50(8,500 - 8,000) = 0.50 \times 500 =\) Rs. \(250\) (Favourable).
In simple words: Fixed overhead variances analyze spending efficiency and volume utilization of plant capacity.
Exam Tip: Fixed Overhead Cost Variance is the sum of Expenditure Variance and Volume Variance.
QUESTION NO.- 11 A Co., producing X and Y uses standard costing. The standard overhead content of each product is: X: Rs. 3 per unit and Y: Rs. 2.25 per unit. The budgeted overhead is Rs. 860 and budgeted time is 3,440 hours. Actual data: Output X 200 units and Y 100 units. Actual time 3200 hours and actual overhead Rs. 875. Compute overhead variances including overhead volume variance and overhead efficiency variance.
Answer: Budgeted Overhead = Rs. 860, Budgeted Hours = 3,440 hours.
Standard Fixed Overhead Rate per hour = \(\frac{860}{3,440} =\) Rs. \(0.25\) per hour.
Actual Output: X = 200 units, Y = 100 units.
Standard Overhead Allowed for Actual Output = \((200 \times 3) + (100 \times 2.25) = 600 + 225 =\) Rs. 825.
Actual Overhead = Rs. 875. Actual Hours = 3,200 hours.
Standard Hours for Actual Output (\(SH\)):
Since standard overhead content per unit is given and standard rate is Rs. 0.25/hr, standard hours per unit are: X = \(\frac{3}{0.25} = 12\) hrs; Y = \(\frac{2.25}{0.25} = 9\) hrs.
\(SH = (200 \times 12) + (100 \times 9) = 2,400 + 900 = 3,300\) hours.
1. Total Overhead Cost Variance = Standard Overhead for Actual Output - Actual Overhead = \(825 - 875 =\) Rs. \(50\) (Adverse).
2. Overhead Expenditure Variance = Budgeted Overhead - Actual Overhead = \(860 - 875 =\) Rs. \(15\) (Adverse).
3. Overhead Volume Variance = \(SR(SH - Budgeted\ Hours) = 0.25(3,300 - 3,440) = 0.25 \times (-140) =\) Rs. \(35\) (Adverse).
4. Overhead Efficiency Variance = \(SR(SH - Actual\ Hours) = 0.25(3,300 - 3,200) = 0.25 \times 100 =\) Rs. \(25\) (Favourable).
In simple words: Total overhead variance breaks down into expenditure, volume, and efficiency variances.
Exam Tip: Verify that Volume Variance plus Efficiency Variance equals Capacity Variance (if capacity hours are given).
QUESTION NO.- 12 Calculate variances from following:
| Items | Budget | Actual |
|---|---|---|
| No. of working days | 20 | 22 |
| Man hour per day | 8000 | 8400 |
| Output per man hour (unit) | 1.00 | 0.90 |
| FO (Rs.) | 160000 | 168000 |
Answer: Budgeted working days = 20, Man hours/day = 8,000. Total Budgeted Hours = \(20 \times 8,000 = 160,000\) hours.
Budgeted Fixed Overhead = Rs. 160,000. Standard Rate per hour (\(SR\)) = \(\frac{160,000}{160,000} =\) Re. 1.00 per hour.
Budgeted Output = \(160,000 \text{ hrs} \times 1.00 \text{ unit/hr} = 160,000\) units.
Actual working days = 22, Man hours/day = 8,400. Total Actual Hours (\(AH\)) = \(22 \times 8,400 = 184,800\) hours.
Actual Output = \(184,800 \text{ hrs} \times 0.90 \text{ unit/hr} = 166,320\) units.
Standard Hours for Actual Output (\(SH\)) = Actual Output / Standard output per hour = \(166,320 / 1.00 = 166,320\) hours.
Actual Fixed Overhead (\(AFO\)) = Rs. 168,000.
1. Fixed Overhead Cost Variance = \(SFO - AFO = (166,320 \times 1) - 168,000 = 166,320 - 168,000 =\) Rs. \(1,680\) (Adverse).
2. Fixed Overhead Expenditure Variance = Budgeted Fixed Overhead - Actual Fixed Overhead = \(160,000 - 168,000 =\) Rs. \(8,000\) (Adverse).
3. Fixed Overhead Volume Variance = \(SR(SH - Budgeted\ Hours) = 1(166,320 - 160,000) =\) Rs. \(6,320\) (Favourable).
In simple words: Use total budgeted hours and actual hours worked to compute fixed overhead variances based on working days and efficiency.
Exam Tip: Carefully compute total hours by multiplying working days by man-hours per day.
QUESTION NO.- 13 In a Factory budgeted output for a year were fixed at 120000 units and budgeted overheads for the year were: Fixed Rs. 12000, variable Rs. 6000 and semi-variable Rs. 1800. Actual production in a month was 8000 units. During the month actual working days were 19 against the budgeted 20 days. Actual overheads: Fixed Rs. 1090 Variable Rs. 480 Semi-variable Rs. 192. Compute variance assuming semi-variable charges are 60 p.c. fixed and 40 p.c. variable.
Answer: Annual Budgeted Output = 120,000 units (Monthly Budgeted Output = 10,000 units).
Budgeted Overheads per month:
Fixed = \(\frac{12,000}{12} =\) Rs. 1,000.
Variable = \(\frac{6,000}{12} =\) Rs. 500.
Semi-variable = \(\frac{1,800}{12} =\) Rs. 150 (Fixed component = \(60\% \text{ of } 150 = 90\); Variable component = \(40\% \text{ of } 150 = 60\)).
Total Budgeted Fixed Overhead per month = \(1,000 + 90 =\) Rs. 1,090.
Total Budgeted Variable Overhead per month = \(500 + 60 =\) Rs. 560.
Standard Variable Overhead rate per unit = \(\frac{560}{10,000} =\) Rs. \(0.056\) per unit.
Actual Production = 8,000 units.
Actual Overheads: Fixed = Rs. 1,090; Variable = Rs. 480; Semi-variable = Rs. 192 (Fixed part = \(192 \times 0.60 = 115.20\); Variable part = \(192 \times 0.40 = 76.80\)).
Total Actual Fixed Overhead = \(1,090 + 115.20 =\) Rs. \(1,205.20\).
Total Actual Variable Overhead = \(480 + 76.80 =\) Rs. \(556.80\).
1. Fixed Overhead Cost Variance = Standard Fixed Overhead for Actual Output - Actual Fixed Overhead
Standard Fixed Overhead per unit = \(\frac{1,090}{10,000} =\) Rs. \(0.109\).
Standard Fixed Overhead for 8,000 units = \(8,000 \times 0.109 =\) Rs. 872.
Cost Variance = \(872 - 1,205.20 =\) Rs. \(333.20\) (Adverse).
2. Variable Overhead Cost Variance = Standard Variable Overhead for Actual Output - Actual Variable Overhead
\(= (8,000 \times 0.056) - 556.80 = 448 - 556.80 =\) Rs. \(108.80\) (Adverse).
In simple words: Separate semi-variable overheads into fixed and variable components before computing variances.
Exam Tip: Adjust annual budget figures to a monthly basis when actual data is given for a single month.
QUESTION NO.- 14 Compute sales value & sales margin variances:
| Product | Bud. Q. | Bud. Price per unit | Actual Q. | Actual Price | St. Cost per unit |
|---|---|---|---|---|---|
| A | 1200 | 5.00 | 2000 | 4.50 | 3.00 |
| B | 800 | 2.50 | 1000 | 2.00 | 1.50 |
Answer: Budgeted Profit per unit (Standard Margin): A = \(5.00 - 3.00 = 2.00\); B = \(2.50 - 1.50 = 1.00\).
1. Sales Value Variance = \((AQ \times AP) - (BQ \times BP)\):
A: \((2,000 \times 4.50) - (1,200 \times 5.00) = 9,000 - 6,000 = +3,000\) (Fav)
B: \((1,000 \times 2.00) - (800 \times 2.50) = 2,000 - 2,000 = 0\) (Nil)
Total Sales Value Variance = Rs. \(3,000\) (Favourable).
2. Sales Price Variance = \(AQ(AP - BP)\):
A: \(2,000(4.50 - 5.00) = -1,000\) (Adv)
B: \(1,000(2.00 - 2.50) = -500\) (Adv)
Total Sales Price Variance = Rs. \(1,500\) (Adverse).
3. Sales Volume Variance = \(BP(AQ - BQ)\):
A: \(5.00(2,000 - 1,200) = +4,000\) (Fav)
B: \(2.50(1,000 - 800) = +500\) (Fav)
Total Sales Volume Variance = Rs. \(4,500\) (Favourable).
4. Sales Margin Variance (Total Profit Variance) = Actual Profit - Budgeted Profit
Actual Profit: A = \(2,000 \times (4.50 - 3.00) = 3,000\); B = \(1,000 \times (2.00 - 1.50) = 500\) (Total = 3,500).
Budgeted Profit: A = \(1,200 \times (5.00 - 3.00) = 2,400\); B = \(800 \times (2.50 - 1.50) = 800\) (Total = 3,200).
Total Sales Margin Variance = \(3,500 - 3,200 =\) Rs. \(300\) (Favourable).
In simple words: Sales variances evaluate performance based on revenue (sales value) and profitability (sales margin).
Exam Tip: Sales margin variances use standard profit per unit instead of standard selling price.
QUESTION NO.- 15 An engineering company manufacturers a single product whose standard cost structure is as follows: Direct Material 2.4 kg at Rs. 30 per kg (Rs. 72.00), Direct Labour 6 hour at Rs. 4 per hour (Rs. 24.00), Factory overhead 6 hours at Rs. 0.75 per hour (Rs. 4.50). Total = Rs. 100.50. The factory overhead absorption rates based on following:
| Production (units) | 80% (6000) | 90% (6750) | 100% (7500) | 110% (8250) |
|---|---|---|---|---|
| Variable overheads | 18,000 | 20,250 | 22,500 | 24,750 |
| Fixed overheads | 11,250 | 11,250 | 11,250 | 11,250 |
| Total | 29,500 | 31,500 | 33,750 | 36,000 |
Actual data for the month of January, 1981: Budgeted production = 7500 units. Material used = 19240 kg at Rs. 31 per kg. Direct Labour = 46830 hours at Rs. 4.20 per hour. Actual factor overhead = Rs. 36,340 (fixed Rs. 11,250). Production completed = 7620 units. Details of work-in-progress: Opening = 120 units, materials fully supplied, 50 per cent converted. Closing = 100 units, materials fully supplied, 50 per cent converted. Computed variances.
Answer: Equivalent Production units for material and conversion:
Units completed = 7,620 units.
Closing WIP = 100 units (Material 100% = 100; Conversion 50% = 50 units).
Opening WIP = 120 units (Material 100% = 120; Conversion 50% = 60 units).
Equivalent Production for Material = \(7,620 + 100 - 120 = 7,600\) units.
Equivalent Production for Labour/Overheads = \(7,620 + 50 - 60 = 7,610\) units.
Standard Material Cost for Equivalent Production = \(7,600 \times 2.4 \text{ kg} \times \text{Rs. } 30 =\) Rs. \(547,200\) (or per unit basis: Standard Material per unit = \(2.4 \times 30 = 72\)).
Actual Material Cost = \(19,240 \times 31 =\) Rs. \(596,440\).
Material Cost Variance = Standard Cost - Actual Cost = \((7,600 \times 72) - 596,440 = 547,200 - 596,440 =\) Rs. \(49,240\) (Adverse).
Material Price Variance = \(AQ(SP - AP) = 19,240(30 - 31) =\) Rs. \(19,240\) (Adverse).
Material Usage Variance = \(SP(SQ - AQ) = 30((7,600 \times 2.4) - 19,240) = 30(18,240 - 19,240) =\) Rs. \(30,000\) (Adverse).
In simple words: When work-in-progress exists, equivalent production units must be computed before calculating standard quantities and variances.
Exam Tip: Calculate equivalent units separately for materials (added at start) and conversion costs (added progressively).
QUESTION NO.- 16 Compute sales turnover variances:
| Product | Budget | Actual | ||
|---|---|---|---|---|
| Qn. | Price | Qn. | Price | |
| A | 2000 | 2.50 | 2400 | 3.00 |
| B | 1500 | 5.00 | 1400 | 4.50 |
| C | 1000 | 7.50 | 1200 | 7.00 |
| D | 500 | 10.00 | 400 | 10.50 |
Answer: Budgeted Sales Value (\(BSV = \sum BQ \times BP\)):
A: \(2,000 \times 2.50 = 5,000\)
B: \(1,500 \times 5.00 = 7,500\)
C: \(1,000 \times 7.50 = 7,500\)
D: \(500 \times 10.00 = 5,000\)
Total Budgeted Sales = \(5,000 + 7,500 + 7,500 + 5,000 =\) Rs. 25,000.
Actual Sales Value (\(ASV = \sum AQ \times AP\)):
A: \(2,400 \times 3.00 = 7,200\)
B: \(1,400 \times 4.50 = 6,300\)
C: \(1,200 \times 7.00 = 8,400\)
D: \(400 \times 10.50 = 4,200\)
Total Actual Sales = \(7,200 + 6,300 + 8,400 + 4,200 =\) Rs. 26,100.
1. Total Sales Value Variance = Actual Sales - Budgeted Sales = \(26,100 - 25,000 =\) Rs. \(1,100\) (Favourable).
2. Sales Price Variance = \(\sum AQ(AP - BP)\):
A: \(2,400(3.00 - 2.50) = +1,200\)
B: \(1,400(4.50 - 5.00) = -700\)
C: \(1,200(7.00 - 7.50) = -600\)
D: \(400(10.50 - 10.00) = +200\)
Total Sales Price Variance = \(1,200 - 700 - 600 + 200 =\) Rs. \(100\) (Adverse).
3. Sales Volume Variance = \(\sum BP(AQ - BQ)\):
A: \(2.50(2,400 - 2,000) = +1,000\)
B: \(5.00(1,400 - 1,500) = -500\)
C: \(7.50(1,200 - 1,000) = +1,500\)
D: \(10.00(400 - 500) = -1,000\)
Total Sales Volume Variance = \(1,000 - 500 + 1,500 - 1,000 =\) Rs. \(1,000\) (Favourable).
In simple words: Sales turnover variances analyze the total revenue difference into price variance and volume variance.
Exam Tip: Total Sales Value Variance equals the sum of Sales Price Variance and Sales Volume Variance.
QUESTION NO.- 17 Compute sales margin variances:
| Product | Bud. Q. | Bud. Price | Actual Q. | Actual Price | St. Cost per unit |
|---|---|---|---|---|---|
| A | 1200 | 5.00 | 2000 | 4.50 | 3.00 |
| B | 800 | 2.50 | 1000 | 2.00 | 1.50 |
Answer: Standard Profit per unit (\(SP - SC\)): A = \(5.00 - 3.00 = 2.00\); B = \(2.50 - 1.50 = 1.00\).
Budgeted Profit: A = \(1,200 \times 2.00 = 2,400\); B = \(800 \times 1.00 = 800\). Total Budgeted Profit = Rs. 3,200.
Actual Profit: A = \(2,000 \times (4.50 - 3.00) = 3,000\); B = \(1,000 \times (2.00 - 1.50) = 500\). Total Actual Profit = Rs. 3,500.
1. Total Sales Margin Variance = Actual Profit - Budgeted Profit = \(3,500 - 3,200 =\) Rs. \(300\) (Favourable).
2. Sales Margin Price Variance = \(\sum AQ(AP - BP)\):
A: \(2,000(4.50 - 5.00) = -1,000\)
B: \(1,000(2.00 - 2.50) = -500\)
Total Sales Margin Price Variance = Rs. \(1,500\) (Adverse).
3. Sales Margin Volume Variance = \(\sum Standard\) Profit(AQ - BQ) \):
A: \(2.00(2,000 - 1,200) = +1,600\)
B: \(1.00(1,000 - 800) = +200\)
Total Sales Margin Volume Variance = \(1,600 + 200 =\) Rs. \(1,800\) (Favourable).
In simple words: Sales margin variances evaluate the difference in profit caused by selling price changes and sales volume changes.
Exam Tip: Total Sales Margin Variance equals the sum of Sales Margin Price Variance and Sales Margin Volume Variance.
QUESTION NO.- 18 The flexible budget used by Deptt. X: Hours: 8,000, 9,000, 10,000. Overheads (Rs.): 5,16,800, 5,71,800, 6,26,800. The following information has been obtained for September 1983: Standard hours produced 8,832 Budgeted Hours 9,600 Actual hours 9,200 Allowed cost per hour Rs. 65 Actual cost per hour Rs. 67.
Answer: Variable overhead rate per hour = Change in overhead / Change in hours = \(\frac{6,26,800 - 5,16,800}{10,000 - 8,000} = \frac{1,10,000}{2,000} =\) Rs. 55 per hour.
Fixed overhead = Total overhead at 8,000 hours - (8,000 \(\times\) 55) = \(5,16,800 - 4,40,000 =\) Rs. 76,800.
Standard hours produced (\(SH\)) = 8,832 hours.
Actual hours (\(AH\)) = 9,200 hours. Budgeted hours = 9,600 hours.
Standard Overhead Allowed for Actual Production = \(8,832 \text{ hrs} \times \text{Rs. } 65 =\) Rs. \(574,080\).
Actual Overhead Cost = \(9,200 \text{ hrs} \times \text{Rs. } 67 =\) Rs. \(616,400\).
1. Overhead Cost Variance = Standard Overhead - Actual Overhead = \(574,080 - 616,400 =\) Rs. \(42,320\) (Adverse).
2. Overhead Expenditure Variance = Budgeted Allowance for Actual Hours - Actual Overhead
Budgeted Allowance for 9,200 hours = \(76,800 + (9,200 \times 55) = 76,800 + 506,000 =\) Rs. \(582,800\).
Expenditure Variance = \(582,800 - 616,400 =\) Rs. \(33,600\) (Adverse).
3. Overhead Efficiency Variance = Variable Rate \(\times (SH - AH) = 55(8,832 - 9,200) = 55 \times (-368) =\) Rs. \(20,240\) (Adverse).
In simple words: Flexible budgets help separate fixed and variable overhead components to analyze efficiency and spending variances accurately.
Exam Tip: Use the high-low method to find variable overhead rates when multiple budget levels are given.
QUESTION NO.- 19 The summarised results of a company for the two years ended 31st December, 1988 and 1987 are given below:- 1988: Sales 770 Rs. lacs, Direct Materials 324, Direct Wages 137, Variable Overheads 69, Fixed Overheads 150, Profit 90. 1987: Sales 600 Rs. lacs, Direct Materials 300, Direct Wages 120, Variable Overheads 60, Fixed Overheads 80, Profit 40. As a result of...
Answer: 1987 figures (Base year): Sales = Rs. 600 lacs, Materials = Rs. 300 lacs, Wages = Rs. 120 lacs, Variable Overheads = Rs. 60 lacs, Fixed Overheads = Rs. 80 lacs, Profit = Rs. 40 lacs.
1988 figures: Sales = Rs. 770 lacs, Materials = Rs. 324 lacs, Wages = Rs. 137 lacs, Variable Overheads = Rs. 69 lacs, Fixed Overheads = Rs. 150 lacs, Profit = Rs. 90 lacs.
Increase in Profit = \(90 - 40 =\) Rs. 50 lacs (Favourable).
Analysis of Profit Variance between 1987 and 1988:
1. Due to Selling Price Increase (10% increase in selling price in 1988 on 1987 volume):
1987 Sales = Rs. 600 lacs. With 10% price increase, effect on profit = \(600 \times 10\% =\) Rs. 60 lacs (Fav).
2. Due to Volume Change:
Sales increased from Rs. 600 lacs to Rs. 770 lacs. Contribution ratio in 1987 = \(\frac{600 - (300 + 120 + 60)}{600} = \frac{120}{600} = 20\%\).
Volume variance effect on profit = Increase in sales at base prices \(\times\) Contribution ratio.
3. Due to Cost Changes (Material, Wages, Variable Overheads, Fixed Overheads):
Compare actual 1988 costs against expected costs adjusted for volume and price inflation.
In simple words: Profit variance analysis breaks down the change in profit between two years into factors like selling price, sales volume, material costs, wage rates, and overhead expenses.
Exam Tip: Always establish base year costs and contribution ratios first before analyzing multi-year profit variances.
QUESTION NO.- 20 The trading results of ZED Ltd. for 1995-96 & 1996-97 are as follows: Material 1995-96: 1,60,000, 1996-97: 2,05,200. Wages 1995-96: 96,000, 1996-97: 1,32,000. Variable Overheads 1995-96: 40,000, 1996-97: 46,000. Fixed Overhead 1995-96: 50,000, 1996-97: 54,800. Total Costs 1995-96: 3,46,000, 1996-97: 4,38,000. Profit 1995-96: 54,000, 1996-97: 90,000. Sales 1995-96: 4,00,000, 1996-97: 5,28,000. Selling price was enhanced by 10% in 1996-97. Material prices and wage rates too have increased by 8% & 10% respectively. Prepare a statement showing how much each factor has contributed to the variation in profit.
Answer: Profit in 1995-96 = Rs. 54,000. Profit in 1996-97 = Rs. 90,000. Increase in Profit = Rs. 36,000.
1. Selling Price Variance: Sales in 1996-97 at 1995-96 prices = \(\frac{5,28,000}{1.10} =\) Rs. 4,80,000. Increase in sales due to volume = \(4,80,000 - 4,00,000 =\) Rs. 80,000.
Effect of selling price increase on actual sales = \(5,28,000 - 4,80,000 =\) Rs. 48,000 (Favourable).
2. Sales Volume Variance: Increase in volume = \(\frac{80,000}{4,00,000} = 20\%\). Base profit margin ratio = \(\frac{54,000}{4,00,000} = 13.5\%\). Volume variance = \(80,000 \times \text{Base contribution ratio}\).
3. Material Cost Variance: Material cost increased due to 8% price hike and volume increase.
4. Wage Variance: Wage cost increased due to 10% rate hike and volume increase.
5. Overhead & Fixed Cost Variances: Compare actual expenses with budgeted/adjusted base year expenses.
In simple words: Reconcile the profit of two years by analyzing variances attributable to selling prices, volume changes, material price/usage, wage rate/efficiency, and fixed overheads.
QUESTION NO.- 21 The following information is available in respect of Y Ltd. for a week: (a) 400 kg of raw material were actually used in producing product 'EXE'. The purchase cost there of being Rs. 24,800. The standard price per kg of raw material is Rs. 60. The expected output is 12 units of product 'EXE' from each kg of raw material. Raw material price variance and usage variance as computed by cost accountant are Rs. 800 (adverse) and Rs. 600 (adverse) respectively. (b) The week is of 40 hours. The standard time to produce one unit of 'EXE' is 30 minutes. The standard wage rate is Rs. 5 per labour hour. The company employs 60 workers who have been paid hourly wage rate as under: Number of Workers: 6, 8, 46. Hourly Wage Rate (Rs.): 4.80, 5.20, 5.00. (c) Budgeted overheads for a four-weekly period is Rs. 81,600. The actual fixed overheads spent during the said week are Rs. 19,800. (d) Entire output of 'EXE' has been sold at its standard selling price of Rs. 15 per unit. You are required to: (i) Compute the variances relating to labour and overheads. (ii) Prepare a statement showing total standard costs, standard profit & actual profit for the week.
Answer: (a) Actual Material Quantity (\(AQ\)) = 400 kg, Actual Cost = Rs. 24,800. Actual Price (\(AP\)) = \(\frac{24,800}{400} =\) Rs. 62 per kg.
Standard Price (\(SP\)) = Rs. 60 per kg.
Material Price Variance = \(AQ(SP - AP) = 400(60 - 62) = -800\) (Adverse - verified).
Material Usage Variance = \(SP(SQ - AQ) = -600\) (Adverse). Since \(SP = 60\), \(60(SQ - 400) = -600 \implies SQ - 400 = -10 \implies SQ = 390\) kg.
Expected output = 12 units per kg. Standard Output for actual material = \(390 \text{ kg} \times 12 = 4,680\) units (or actual output produced = \((400 - 10) \times 12 = 4,680\) units).
(b) Standard time per unit = 30 minutes (0.5 hours). Standard Hours for actual production (\(SH\)) = \(4,680 \times 0.5 = 2,340\) hours.
Standard Wage Rate (\(SR\)) = Rs. 5 per hour.
Actual Hours Worked (\(AH\)): 60 workers working 40 hours = 2,400 hours total.
Actual wage payments: \(6 \text{ workers} \times 40 \text{ hrs} \times 4.80 = 1,152\); \(8 \times 40 \times 5.20 = 1,664\); \(46 \times 40 \times 5.00 = 9,200\). Total Actual Wages = \(1,152 + 1,664 + 9,200 =\) Rs. 12,016.
Actual Wage Rate (\(AR\)) = \(\frac{12,016}{2,400} =\) Rs. \(5.0067\) per hour.
1. Labour Rate Variance = \(\sum AH(SR - AR) = (2,400 \times 5) - 12,016 = 12,000 - 12,016 =\) Rs. \(16\) (Adverse).
2. Labour Efficiency Variance = \(SR(SH - AH) = 5(2,340 - 2,400) = 5 \times (-60) =\) Rs. \(300\) (Adverse).
3. Total Labour Cost Variance = \(16 + 300 =\) Rs. \(316\) (Adverse).
(c) Overheads: Budgeted overheads for 4 weeks = Rs. 81,600. Weekly Budgeted Overhead = \(\frac{81,600}{4} =\) Rs. 20,400.
Actual Fixed Overhead = Rs. 19,800.
Overhead Expenditure Variance = Budgeted Overhead - Actual Overhead = \(20,400 - 19,800 =\) Rs. \(600\) (Favourable).
(d) Statement of Standard Cost and Profit:
Output sold = 4,680 units @ Rs. 15 = Rs. 70,200.
Standard Material Cost = \(390 \text{ kg} \times 60 =\) Rs. 23,400.
Standard Labour Cost = \(2,340 \text{ hrs} \times 5 =\) Rs. 11,700.
Standard Overheads = Rs. 20,400.
Total Standard Cost = \(23,400 + 11,700 + 20,400 =\) Rs. 55,500.
Standard Profit = \(70,200 - 55,500 =\) Rs. 14,700.
Actual Profit = Sales - Actual Costs = \(70,200 - (24,800 + 12,016 + 19,800) = 70,200 - 56,616 =\) Rs. \(13,584\).
In simple words: Combine material, labour, and overhead variances to reconcile standard profit with actual profit for the week.
Exam Tip: Be careful to convert four-weekly overhead budgets into weekly figures by dividing by 4.
QUESTION NO.- 22 A Cost Accountant of a Company was given the following information regarding the overheads for February 1987: (a) Overheads cost variance Rs. 1,400 adverse. (b) Overheads volume variance Rs. 1,000 adverse. (c) Budgeted hours for February 1987 1,200 hours. (d) Budgeted overheads for February 1987 Rs. 6,000. (e) Actual rate of recovery of overheads Rs. 8 per hours. You are required to: (1) Overheads expenditure variance. (2) Actual overheads incurred. (3) Actual hours for actual production. (4) Overheads capacity variance. (5) Overheads efficiency variance. (6) Standard hours for actual production.
Answer: Budgeted Hours = 1,200 hours, Budgeted Overheads = Rs. 6,000.
Standard Overhead Rate per hour (\(SR\)) = \(\frac{6,000}{1,200} =\) Rs. 5 per hour.
1. Overheads Volume Variance = \(SR(SH - Budgeted\ Hours)\). Given Volume Variance = Rs. 1,000 (Adverse) = \(-1,000\).
\(-1,000 = 5(SH - 1,200) \implies SH - 1,200 = -200 \implies SH = 1,000\) hours (Standard hours for actual production).
2. Overheads Cost Variance = Standard Overhead for Actual Production - Actual Overheads = \(-1,400\).
Standard Overhead (\(SFO\)) = \(SH \times SR = 1,000 \times 5 =\) Rs. 5,000.
\(-1,400 = 5,000 - Actual\) Overheads \implies Actual\ Overheads = 5,000 + 1,400 = \) Rs. 6,400.
3. Overheads Expenditure Variance = Budgeted Overheads - Actual Overheads = \(6,000 - 6,400 =\) Rs. \(400\) (Adverse).
4. Actual Hours for actual production: Since actual recovery rate is Rs. 8 per hour and actual overhead is Rs. 6,400, Actual Hours (\(AH\)) = \(\frac{6,400}{8} = 800\) hours.
5. Overheads Capacity Variance = \(SR(Budgeted\ Hours - AH)\) or similar capacity measure. Assuming Capacity Hours = Budgeted hours = 1,200.
6. Overheads Efficiency Variance = \(SR(SH - AH) = 5(1,000 - 800) = 5 \times 200 =\) Rs. \(1,000\) (Favourable).
In simple words: Work backwards from given total cost and volume variances using standard hourly recovery rates to find missing operational hours and costs.
Exam Tip: Standard Overhead Rate is calculated as Budgeted Overheads divided by Budgeted Hours.
QUESTION NO.- 23 One kilogram of product 'K' requires two chemicals A & B. The following were the details of product 'K' for the month of June, 1987: (a) Standard mix Chemical 'A' 50% & Chemical 'B' 50%. (b) Standard price per kilogram of Chemical 'A' Rs. 12 and Chemical 'B' Rs. 15. (c) Actual input of Chemical 'B' 70 kilograms. (d) Actual price per kilogram of Chemical 'A' Rs. 15. (e) Standard normal loss 10% of total input. (f) Materials cost variance total Rs. 650 adverse. (g) Materials yield variance total Rs. 135 adverse. You are required to calculate: (!) Materials mix variance total (2) Materials usage variance total (3) Materials price variance total (4) Actual loss of actual input (5) Actual input of Chemical 'A' (6) Actual price per kilogram of Chemical 'B'.
Answer: Standard Mix: A = 50%, B = 50%. Standard Price: A = Rs. 12, B = Rs. 15.
Standard normal loss = 10% of input. Standard output = 90% of input.
Let actual input of A = \(A\) kg. Actual input of B = 70 kg. Total actual input = \(A + 70\).
Materials yield variance = Rs. 135 (Adverse). Materials cost variance = Rs. 650 (Adverse).
Material Usage Variance = Cost Variance - Price Variance (or calculated via standard sub-variances).
Yield variance is the sub-variance of usage variance. Total Usage Variance = Mix Variance + Yield Variance.
By solving simultaneous equations based on standard mix proportions and given adverse variances, determine actual inputs and prices.
In simple words: Use simultaneous equations connecting standard costs, actual mix ratios, and sub-variances to find unknown prices and quantities.
Exam Tip: Material Usage Variance is equal to the sum of Material Mix Variance and Material Yield (Sub-Usage) Variance.
QUESTION NO.- 24 Compute the missing data indicated by the questions marks from the following:-
| Product R | Product S | |
|---|---|---|
| Sales Quantity: Standard (units) | ? | 400 |
| Actual (units) | 500 | ? |
| Price/unit: Standard | Rs. 12 | Rs. 15 |
| Actual | Rs. 15 | Rs. 20 |
| Sales price variances | ? | ? |
| Sales volume variance | 1,200 Favourable | ? |
| Sales value variance | ? | ? |
| Sales mix variance for both the products together was Rs. 450 F. "F" denotes Favourable. | ||
Answer: For Product R: Actual Quantity (\(AQ\)) = 500 units, Standard Price (\(SP\)) = Rs. 12, Actual Price (\(AP\)) = Rs. 15.
1. Sales Price Variance for R = \(AQ(AP - SP) = 500(15 - 12) = +1,500\) (Favourable).
2. Sales Volume Variance for R = \(SP(AQ - BQ) = +1,200\) (Favourable).
\(12(500 - BQ) = 1,200 \implies 500 - BQ = 100 \implies BQ = 400\) units (Standard Quantity for R).
3. Sales Value Variance for R = Actual Sales - Standard Sales.
Actual Sales = \(500 \times 15 = 7,500\). Standard Sales = \(400 \times 12 = 4,800\). Sales Value Variance = \(7,500 - 4,800 = +2,700\) (Favourable).
For Product S: Standard Quantity = 400 units, Standard Price = Rs. 15, Actual Price = Rs. 20.
Using total sales mix variance and missing actual quantities for product S, solve for actual quantity of S.
In simple words: Calculate missing quantities and variances by using the standard relationship between sales price, volume, and value variances.
Exam Tip: Sales Volume Variance is calculated as difference in quantities multiplied by standard price.
QUESTION NO.- 25 JS Limited used a full standard cost system with raw materials inventory carried at standard. The following data was taken from the records of the company for the year ended 31.12.1989. Opening raw materials inventory 300, Closing raw materials inventory 250, Net purchases 410, Materials price variance 10 A, Materials usage variance 20 A, Direct labour cost (actuals) 900, Direct labour cost at standard 840, Actual overhead cost incurred 875, Overheads cost variance 45 F, Opening work in progress inventory 120, Closing work in progress inventory 140, Opening finished goods inventory 360, Cost of goods sold reported 2,240. You are required to compute: (1) Raw Material purchases at standard. (2) Raw Materials consumed at actuals. (3) Raw Materials consumed at standard. (4) Labour cost variance. (5) Standard overhead costs. (6) Total manufacturing cost at standard. (7) Cost of goods manufactured. (8) Cost of products sold to customers. (9) Closing finished goods inventory.
Answer: 1. Raw Material purchases at standard = Net purchases + Price variance = \(410 + 10 =\) Rs. 420 (assuming net purchases at actual, or adjusted for price variance).
2. Raw Materials consumed at actuals = Opening Inventory + Purchases - Closing Inventory.
3. Raw Materials consumed at standard = Actual consumption adjusted for Material Usage Variance.
4. Labour Cost Variance = Standard Labour Cost - Actual Labour Cost = \(840 - 900 =\) Rs. \(60\) (Adverse).
5. Standard Overhead Costs = Actual Overhead Cost - Overhead Cost Variance (since Cost Variance = Standard Cost - Actual Cost, \(45 \text{ F} = Standard - 875 \implies Standard = 875 + 45 =\) Rs. 920).
6. Total Manufacturing Cost at standard = Standard Material Cost + Standard Labour Cost + Standard Overhead Cost.
7. Cost of Goods Manufactured = Total Manufacturing Cost adjusted for Opening and Closing WIP.
8. Cost of Goods Sold = Cost of Goods Manufactured adjusted for Opening and Closing Finished Goods.
9. Closing Finished Goods Inventory = Derived from Cost of Goods Manufactured and Cost of Goods Sold.
In simple words: Systematically trace inventory flows, standard costs, and variances from raw materials through WIP to finished goods.
Exam Tip: Cost of Goods Sold equals Cost of Goods Manufactured plus Opening Finished Goods minus Closing Finished Goods.
QUESTION NO.- 26 The following information is available from the cost records of a Company for February, 1993: Materials purchase: 20,000 pieces Rs. 88,000. Materials consumed: 19,000 pieces. Actual wages paid for 4,950 hours Rs. 24,750. Factory Overheads Incurred Rs. 44,000. Factory Overheads Budgeted Rs. 40,000. Units produced 1,800. Standard Rates and Prices are: Standard Input 10 pieces per unit. Standard requirement 2.5 hours per unit. Direct Material Rate Rs. 4 per piece. Direct Labour Rate Rs. 4 per hour. Overhead Rs. 8 per labour hour. Required: (a) Show the Standard Cost Card. (b) Compute all material, labour and overhead variances for February, 1993.
Answer: (a) Standard Cost Card per unit:
Direct Material: 10 pieces @ Rs. 4 = Rs. 40
Direct Labour: 2.5 hours @ Rs. 4 = Rs. 10
Factory Overheads: 2.5 hours @ Rs. 8 = Rs. 20
Total Standard Cost per unit = Rs. 70.
(b) Actual production = 1,800 units.
1. Material Variances:
Standard Quantity for actual production (\(SQ\)) = \(1,800 \times 10 = 18,000\) pieces. Standard Price (\(SP\)) = Rs. 4.
Actual Quantity consumed (\(AQ\)) = 19,000 pieces. Actual Price (\(AP\)) = \(\frac{88,000}{20,000} =\) Rs. 4.40 per piece.
Material Cost Variance = \((SQ \times SP) - (AQ \times AP) = (18,000 \times 4) - (19,000 \times 4.40) = 72,000 - 83,600 =\) Rs. \(11,600\) (Adverse).
Material Price Variance = \(AQ(SP - AP) = 19,000(4 - 4.40) =\) Rs. \(7,600\) (Adverse).
Material Usage Variance = \(SP(SQ - AQ) = 4(18,000 - 19,000) =\) Rs. \(4,000\) (Adverse).
2. Labour Variances:
Standard Hours for actual production (\(SH\)) = \(1,800 \times 2.5 = 4,500\) hours. Standard Rate (\(SR\)) = Rs. 4.
Actual Hours (\(AH\)) = 4,950 hours. Actual Rate (\(AR\)) = \(\frac{24,750}{4,950} =\) Rs. 5 per hour.
Labour Cost Variance = \((SH \times SR) - (AH \times AR) = (4,500 \times 4) - 24,750 = 18,000 - 24,750 =\) Rs. \(6,750\) (Adverse).
Labour Rate Variance = \(AH(SR - AR) = 4,950(4 - 5) =\) Rs. \(4,950\) (Adverse).
Labour Efficiency Variance = \(SR(SH - AH) = 4(4,500 - 4,950) =\) Rs. \(1,800\) (Adverse).
3. Overhead Variances:
Standard Overheads allowed = \(4,500 \text{ hrs} \times \text{Rs. } 8 =\) Rs. 36,000.
Actual Overheads incurred = Rs. 44,000.
Overhead Cost Variance = Standard Overhead - Actual Overhead = \(36,000 - 44,000 =\) Rs. \(8,000\) (Adverse).
In simple words: Standard cost cards provide the baseline unit costs needed to compute material, labour, and overhead variances for actual production.
Exam Tip: Always construct a clear standard cost card first before tackling comprehensive variance problems.
QUESTION NO.- 27 A company uses standard costing system. The sales data for a period are as under: Product: Budgeted Sales Units = A: 1280, B: 3200, C: 1920. Budgeted Selling Price Per Unit = A: Rs. 20, B: Rs. 12, C: Rs. 16. Actual Sales Units = A: 650, B: 3900, C: 1950. Actual Sales Value = A: Rs. 12350, B: Rs. 50700, C: Rs. 29250. The Cost data are as under: Standard Cost Per Unit = A: Rs. 16, B: 10, C: 13. Actual Cost Per Unit = A: Rs. 18, B: 12, C: 13. You are required to calculate the following for the period: (i) Gross Margin Total Sales Variance. (ii) Gross Margin Sales Volume Variance. (iii) Gross Margin Sales Mix Variance. (iv) Gross Margin Sales Quantity Variance. (v) Sales Price Variance. (vi) Total Cost Variance.
Answer: Budgeted profit per unit (Standard Margin = Budgeted Selling Price - Standard Cost):
A = \(20 - 16 =\) Rs. 4; B = \(12 - 10 =\) Rs. 2; C = \(16 - 13 =\) Rs. 3.
Actual profit per unit (Actual Selling Price - Actual Cost):
Actual Selling Price: A = \(\frac{12,350}{650} = 19\); B = \(\frac{50,700}{3,900} = 13\); C = \(\frac{29,250}{1,950} = 15\).
Actual Profit: A = \(19 - 18 = 1\); B = \(13 - 12 = 1\); C = \(15 - 13 = 2\).
1. Gross Margin Total Sales Variance = Actual Gross Margin - Budgeted Gross Margin.
Budgeted Gross Margin: A = \(1,280 \times 4 = 5,120\); B = \(3,200 \times 2 = 6,400\); C = \(1,920 \times 3 = 5,760\) (Total = 17,280).
Actual Gross Margin: A = \(650 \times 1 = 650\); B = \(3,900 \times 1 = 3,900\); C = \(1,950 \times 2 = 3,900\) (Total = 8,450).
Total Sales Variance = \(8,450 - 17,280 =\) Rs. \(8,830\) (Adverse).
2. Sales Price Variance = \(\sum AQ(AP - BP)\):
A: \(650(19 - 20) = -650\)
B: \(3,900(13 - 12) = +3,900\)
C: \(1,950(15 - 16) = -1,950\)
Total Sales Price Variance = \(-650 + 3,900 - 1,950 = +1,300\) (Favourable).
3. Total Cost Variance = Standard Cost for actual output - Actual Cost for actual output.
In simple words: Gross margin sales variances measure profitability differences based on standard margins, sales volumes, mixes, and selling prices.
Exam Tip: Gross margin variances incorporate standard profit per unit rather than standard selling prices.
Chartered Accountancy IPCC Costing Assignments for Standard Costing Questions
Revision Assignment: Standard Costing Questions (Chartered Accountancy)
Access structured practice assignments for Standard Costing Questions designed in alignment with the latest Chartered Accountancy curriculum for IPCC Costing. These printable sets cover objective and descriptive problem types to support thorough revision.
Why Practice IPCC Costing Assignments?
- Syllabus Compliance: Sets reflect current Chartered Accountancy evaluation criteria and official marking frameworks.
- Multi-Format Practice: Includes varied problem types designed to deepen comprehension across all sub-topics.
- Time Management: Routine practice optimizes pacing to finish school examinations comfortably within schedule.
Effective Strategy for IPCC Costing Assignments
- Concept Foundation: Review the NCERT book for IPCC Costing thoroughly before diving into assignment tasks.
- Self-Evaluation: Solve exercises independently before inspecting professional answer guides.
- Progress Monitoring: Note down complex formulas or concepts, clearing them up using available online practice aids.
FAQs
You can download free PDF assignments for IPCC Costing Standard Costing Questions from StudiesToday.com. These practice sheets have been updated for the 2026-27 session covering all concepts from latest NCERT textbook.
Yes, our teachers have given solutions for all questions in the IPCC Costing Standard Costing Questions assignments. This will help you to understand step-by-step methodology to get full marks in school tests and exams.
Yes. These assignments are designed as per the latest Chartered Accountancy syllabus for 2026. We have included huge variety of question formats such as MCQs, Case-study based questions and important diagram-based problems found in Standard Costing Questions.
Practicing topicw wise assignments will help IPCC students understand every sub-topic of Standard Costing Questions. Daily practice will improve speed, accuracy and answering competency-based questions.
Yes, all printable assignments for IPCC Costing Standard Costing Questions are available for free download in mobile-friendly PDF format.