CA IPCC Overheads Costing Solutions to Questions for CA IPCC Cost Accounting also includes notes, Questions and answers. CA IPCC Students please refer to the attached file for solutions for important questions which came in previous examinations for Cost Accounting and also study notes. Refer to other links too for detailed study notes/ question banks and solutions on all chapters of Cost Accounting for CA IPCC Refer to attached file for CA IPCC Overheads Costing Solutions
Question 1. Direct Material = Rs. 45,000, Direct Labour = Rs. 60,000, Overheads = Rs. 90,000. Calculate Prime Cost and Cost of Production, and determine overhead recovery rates based on: (1) Labour hours (15,000 hours), (2) Machine hours (30,000 hours), (3) Direct labour cost, (4) Material cost, (5) Prime cost.
Answer:
Prime Cost = Direct Material + Direct Labour
Prime Cost = 45000 + 60000 = Rs. 105000
Cost of Production = Prime Cost + Overheads
Cost of Production = 105000 + 90000 = Rs. 195000
(1) Recovery Rate based on Labour hours:
\(\text{Rate} = \frac{\text{Overheads}}{\text{Labour Hours}} = \frac{90000}{15000} = \text{Rs. } 6 \text{ per hour}\)
(2) Recovery Rate based on Machine hours:
\(\text{Rate} = \frac{\text{Overheads}}{\text{Machine Hours}} = \frac{90000}{30000} = \text{Rs. } 3 \text{ per hour}\)
(3) Recovery Rate based on Direct Labour Cost:
\(\text{Rate} = \frac{\text{Overheads}}{\text{Direct Labour Cost}} \times 100 = \frac{90000}{60000} \times 100 = 150\% \text{ or } \text{Rs. } 1.50 \text{ per rupee of labour cost}\)
(4) Recovery Rate based on Material Cost:
\(\text{Rate} = \frac{\text{Overheads}}{\text{Direct Material Cost}} \times 100 = \frac{90000}{45000} \times 100 = 200\% \text{ or } \text{Rs. } 2.00 \text{ per rupee of material cost}\)
(5) Recovery Rate based on Prime Cost:
\(\text{Rate} = \frac{\text{Overheads}}{\text{Prime Cost}} \times 100 = \frac{90000}{105000} \times 100 = 85.71\% \text{ or } \text{Rs. } 0.857 \text{ per rupee of prime cost}\)
In simple words: Overheads can be charged to jobs using different bases like labour hours, machine hours, or material cost depending on what drives the cost most.
Exam Tip: Always state the formula clearly before substituting values to ensure full marks in cost sheet problems.
Question 2. For a given job, Direct Material = Rs. 2100, Direct Wages = Rs. 660, Overheads incurred = Rs. 90000, Labour hours incurred = 20000, Machine hours operated = 25000, Direct labour cost = Rs. 60000. Determine the factory cost of the job using different recovery methods.
Answer:
Overhead Recovery Rates:
(i) Based on Labour Hours: \(\frac{90000}{20000} = \text{Rs. } 4.50 \text{ per hour}\)
(ii) Based on Machine Hours: \(\frac{90000}{25000} = \text{Rs. } 3.60 \text{ per hour}\)
(iii) Based on Direct Labour Cost: \(\frac{90000}{60000} = 150\% \text{ or } 1.50 \text{ per rupee}\)
Factory Cost under different methods for the job (Material = Rs. 2100, Wages = Rs. 660):
- Based on Machine Hours (2400 hours @ Rs. 3.60): Prime Cost (2760) + Overheads (8640) = Rs. 11400
- Based on Labour Hours (3300 hours @ Rs. 4.50): Prime Cost (2760) + Overheads (14850) = Rs. 17610
- Based on Direct Labour Cost (150% of Rs. 660): Prime Cost (2760) + Overheads (990) = Rs. 3750
In simple words: The total cost of a job changes depending on which overhead absorption rate is applied.
Exam Tip: Check whether the question asks for percentage or absolute rate per hour before applying it to the job.
Question 3. A company has three production departments (Dept I, Dept II, Dept III) with Work Overheads of Rs. 5000, Rs. 90000, and Rs. 10000 respectively, and Direct Wages of Rs. 10000, Rs. 50000, and Rs. 10000. Calculate department-wise recovery rates and compare with the overall recovery rate.
Answer:
Total Work Overheads = 5000 + 90000 + 10000 = Rs. 105000
Total Direct Wages = 10000 + 50000 + 10000 = Rs. 70000
Overall Recovery Rate (percentage of wages) = \(\frac{105000}{70000} \times 100 = 150\%\)
Department-wise recovery rates (Work O.H. as % of Direct Wages):
- Dept I: \(\frac{5000}{10000} \times 100 = 50\%\)
- Dept II: \(\frac{90000}{50000} \times 100 = 180\%\)
- Dept III: \(\frac{10000}{10000} \times 100 = 100\%\)
In simple words: Department-wise rates are more accurate than a single blanket rate when departments have diverse cost structures.
Exam Tip: Always use department-wise rates when detailed departmental information is available.
Question 4. A company uses a single blanket recovery rate based on overall wages. Overall Work Overheads = Rs. 360,000 + Rs. 140,000 + Rs. 125,000 = Rs. 625,000. Overall Wages = Rs. 89,000 + Rs. 350,000 + Rs. 70,000 = Rs. 500,000. Calculate the blanket recovery rate and determine the selling price of a job with material Rs. 2100, wages Rs. 660, and factory overheads. Add 30% for selling expenses and profit.
Answer:
Blanket Recovery Rate = \(\frac{625000}{500000} \times 100 = 125\% \text{ of direct wages}\)
Factory Cost calculation using existing method:
Direct Material = Rs. 2100
Direct Wages = Rs. 660
Factory Overheads (125% of Rs. 660) = Rs. 825
Factory Cost = 2100 + 660 + 825 = Rs. 3585
Add 30% for selling expense and profit = \(3585 \times 0.30 =\) Rs. 1075.50
Total Selling Price = 3585 + 1075.50 = Rs. 4660.50
In simple words: A blanket rate applies a single percentage across all departments regardless of where the work is actually done.
Exam Tip: Blanket rates distort job costs if departments have varying intensity of machine or labour usage.
Question 5. In an organization with three departments (Machinery, Assembly, Packing), calculate overhead recovery rates and determine the total cost and selling price of a job given budgeted overheads and hours.
Answer:
Machinery Department O.H. Recovery Rate = \(\frac{360000}{80000} = \text{Rs. } 4.50 \text{ per machine hour}\)
Assembly Department O.H. Recovery Rate = \(\frac{140000}{100000} = \text{Rs. } 1.40 \text{ per labour hour}\)
Packing Department O.H. Recovery Rate = \(\frac{125000}{50000} = \text{Rs. } 2.50 \text{ per labour hour}\)
Job Cost Calculation using departmental rates:
Direct Material = Rs. 2100
Direct Wages = Rs. 660
Overheads:
- Machine Dept (180 hrs @ Rs. 4.50) = Rs. 810
- Assembly Dept (120 hrs @ Rs. 1.40) = Rs. 168
- Packing Dept (40 hrs @ Rs. 2.50) = Rs. 100
Factory Cost = 2100 + 660 + 810 + 168 + 100 = Rs. 3838
Add 30% for selling expenses and profit = \(3838 \times 0.30 =\) Rs. 1151.40
Total Selling Price = 3838 + 1151.40 = Rs. 4989.40
In simple words: Departmental rates match overheads to the exact resources consumed by each job.
Exam Tip: Ensure hours are multiplied by the correct departmental rate corresponding to machine or labour hours.
Question 6. Calculate labour cost per hour and factory overhead recovery rates per hour for Machine Shop and Assembly Shop given budgeted overheads and hours. Also distribute administration and selling overheads as a percentage of factory cost.
Answer:
Labour Cost per Hour:
- Machine Shop = \(\frac{63000}{12000} = \text{Rs. } 5.25 \text{ per hour}\)
- Assembly Shop = \(\frac{48000}{10000} = \text{Rs. } 4.80 \text{ per hour}\)
Factory O.H. per Hour of Direct Labour:
- Machine Shop = \(\frac{88200}{12000} = \text{Rs. } 7.35 \text{ per hour}\)
- Assembly Shop = \(\frac{51800}{10000} = \text{Rs. } 5.18 \text{ per hour}\)
Administration O.H. Recovery Rate = \(\frac{90000}{450000} \times 100 = 20\% \text{ of factory cost}\)
Selling Distribution O.H. Recovery Rate = \(\frac{143100}{540000} \times 100 = 26.5\% \text{ of cost of production}\)
In simple words: Different overhead rates are computed for production, administration, and selling functions.
Exam Tip: Pay close attention to the denominator (labour hours vs. machine hours vs. factory cost) specified for each overhead recovery rate.
Question 7. A company has three production departments and two service departments. Allocate service department costs to production departments using the direct distribution method and calculate overhead rates per labour hour.
Answer:
Allocation of Service Department Overheads:
Service Dept P costs allocated in ratio 40:30:20:10
Service Dept Q costs allocated in ratio 30:30:20:20
Total Overheads after redistribution:
- Dept A = 18332
- Dept B = 18832
- Dept C = 15536
Overhead Rate per Labour Hour = \(\frac{\text{Total O.H.}}{\text{Labour Hours}}\)
- Dept A: \(\frac{18332}{50000} = \text{Rs. } 0.37 \text{ per hour}\)
- Dept B: \(\frac{18832}{60000} = \text{Rs. } 0.31 \text{ per hour}\)
- Dept C: \(\frac{15536}{20000} = \text{Rs. } 0.78 \text{ per hour}\)
In simple words: Service department costs must be shifted to production departments before calculating final absorption rates.
Answer:
Let total cost of Department X be \(x\) and Department Y be \(y\).
\(x = 9000 + 0.20y\)
\(y = 3000 + 0.10x\)
Substitute \(x\) into \(y\):
\(y = 3000 + 0.10(9000 + 0.20y)\)
\(y = 3000 + 900 + 0.02y\)
\(0.98y = 3900 \implies y = 3979.59 \approx 3980\)
\(x = 9000 + 0.20(3980) = 9000 + 796 = 9796\)
Distribute these total service costs to production departments A, B, C based on given percentages.
In simple words: The simultaneous equation method solves for exact reciprocal service costs using linear equations.
Exam Tip: Always round off final simultaneous equation values carefully to maintain arithmetic consistency.
Question 9. Using the Step Ladder Method, distribute service department costs sequentially where service departments render services to other service departments in a one-way hierarchy.
Answer:
Step 1: Distribute the cost of the first service department that serves the maximum number of other service departments.
Step 2: Proceed sequentially to the next service department, ignoring reverse service allocations.
Step 3: Once a service department's cost is fully distributed, it does not receive any subsequent re-allocations.
Total production department overheads are then divided by respective labour or machine hours to get absorption rates.
In simple words: The step ladder method handles mutual services in a one-way downward sequence.
Exam Tip: Follow the strict sequence of departments from left to right as arranged in the step ladder table.
Question 10. A company operates two production departments (PD1, PD2) and two service departments (SD1, SD2). Allocate overheads using the repeated distribution method and determine labour hour recovery rates.
Answer:
Initial Overheads allocated:
- PD1 = 37500, PD2 = 8824, SD1 = 5515, SD2 = 7720
Distribute SD1 and SD2 repeatedly in given proportions until service department balances are reduced to zero.
Total Overheads after distribution:
- PD1 = 93941
- PD2 = 108324
Labour Hour Recovery Rate = \(\frac{\text{Total O.H.}}{\text{Direct Labour Hours}}\)
- PD1: \(\frac{93941}{50000} = \text{Rs. } 1.88 \text{ per hour}\)
- PD2: \(\frac{108324}{50000} = \text{Rs. } 2.17 \text{ per hour}\)
In simple words: Repeated distribution successively allocates service costs back and forth until negligible amounts remain.
Exam Tip: Continue redistribution for at least 3-4 cycles until the remainder is less than a rupee.
Question 11. Calculate under-absorbed and over-absorbed overheads when actual overheads incurred are Rs. 4,150,000 and recovered overheads are Rs. 3,750,000 (based on 150,000 hours @ Rs. 25 per hour). Pass necessary journal entries and show disposal using supplementary rates.
Answer:
Actual Overheads Incurred = Rs. 4,150,000
Absorbed Overheads = Rs. 3,750,000
Unabsorbed Overheads = \(4150000 - 3750000 =\) Rs. 400,000
Analysis of Unabsorbed Overheads:
- Due to defective planning (40%) = Rs. 160,000 (Charged to Cost P/L Account)
- Due to general price increase (60%) = Rs. 240,000 (Distributed via supplementary rate to WIP, Finished Stock, and Cost of Sales)
Supplementary Rate = \(\frac{240000}{60000 \text{ units}} = \text{Rs. } 4 \text{ per unit}\)
In simple words: Abnormal unabsorbed overhead goes to P/L, while normal unabsorbed overhead is spread over inventory and sales.
Exam Tip: Distinguish clearly between normal and abnormal causes of unabsorbed overheads for correct accounting treatment.
Question 12. A company produces products A, B, C, and D. Apportion total overheads of Rs. 2,700,000 based on production capacity weights and calculate department-wise or product-wise recovery rates and statement of cost and profit.
Answer:
Production Capacities: A = 50,000, B = 100,000, C = 150,000, D = 300,000 (Total = 600,000)
Proportion ratio = 1 : 2 : 3 : 6
Apportioned Overheads:
- Product A: \(1620000 \times \frac{50000}{270000} =\) Rs. 24,300
- Product B: \(1620000 \times \frac{100000}{270000} =\) Rs. 32,400
- Product C: \(1620000 \times \frac{150000}{270000} =\) Rs. 48,600
- Product D: \(1620000 \times \frac{300000}{270000} =\) Rs. 56,700
Prepare Statement of Cost and Profit by adding material, wages, factory overheads, and selling expenses.
In simple words: When a factory produces multiple products, overheads are shared based on production capacity or output weight.
Exam Tip: Verify that the sum of all apportioned product overheads equals the total overhead pool.
Chartered Accountancy IPCC Costing Assignments for Overheads Costing Solutions
Revision Assignment: Overheads Costing Solutions (Chartered Accountancy)
Access structured practice assignments for Overheads Costing Solutions designed in alignment with the latest Chartered Accountancy curriculum for IPCC Costing. These printable sets cover objective and descriptive problem types to support thorough revision.
Why Practice IPCC Costing Assignments?
- Curriculum Standards: Assignments match modern Chartered Accountancy sample formats to ensure relevant preparation.
- Thorough Revision: Detailed problem sets reinforce core concepts and eliminate conceptual weak spots.
- Execution Speed: Timed practice with assignment sets sharpens overall response timing.
How to Approach Costing Overheads Costing Solutions Assignments
- Concept Foundation: Review the NCERT book for IPCC Costing thoroughly before diving into assignment tasks.
- Self-Evaluation: Solve exercises independently before inspecting professional answer guides.
- Progress Monitoring: Note down complex formulas or concepts, clearing them up using available online practice aids.
FAQs
You can download free PDF assignments for IPCC Costing Overheads Costing Solutions from StudiesToday.com. These practice sheets have been updated for the 2026-27 session covering all concepts from latest NCERT textbook.
Yes, our teachers have given solutions for all questions in the IPCC Costing Overheads Costing Solutions assignments. This will help you to understand step-by-step methodology to get full marks in school tests and exams.
Yes. These assignments are designed as per the latest Chartered Accountancy syllabus for 2026. We have included huge variety of question formats such as MCQs, Case-study based questions and important diagram-based problems found in Overheads Costing Solutions.
Practicing topicw wise assignments will help IPCC students understand every sub-topic of Overheads Costing Solutions. Daily practice will improve speed, accuracy and answering competency-based questions.
Yes, all printable assignments for IPCC Costing Overheads Costing Solutions are available for free download in mobile-friendly PDF format.