Water Supply Engineering Mock Test

1. Suspended solids are measured by which of the following?

2. What is the fire demand of the city of 1lakh population by Buston's formula?

3. Which of the following can be identified as the objective of water supply scheme?

4. What are the factors affecting per capita demand?

5. Which of the following is not a component of plumbing water supply system?

6. Which of the following is not true about lead pipes?

7. Which of the following statement is correct?

8. What happens when water contains 8-20 ppm of fluoride concentration?

9. Which material is used in contact filters for the removal of fluorides?

10. The average quantity of water (in lpcd) required for domestic purposes according to IS code is

11. Which of the following can act as a type of variation in water demand?

12. Which material is used for removing fluorides from hard water containing 3ppm of fluorides?

13. Who is responsible for the clean-up of oil spill?

14. Which of the following is not used for defluoridation?

15. What is the design period for the water treatment unit?

16. The Federal Water Pollution Control Act of 1948 was the first major U.S. law to address water pollution.

17. What is the design discharge for intake structures?

18. The process of reducing the fluoride content from water is called

19. Which reservoir is helpful in permitting the pumps or the water treatment plants to work at a uniform rate?

20. Which type of water is generally used in the treatment of water?

21. In which of the following reservoir the flood crest downstream can be better controlled and regulated properly?

22. What are the types of flood control reservoirs?

23. In which type of water demand, minimum average consumption of water takes place?

24. While considering the design period, which must be given more priority?

25. Water lost in theft and waste contributes to how much % of total consumption?

26. Fluorex is a special mixture of

27. Which of the following is not true about plastic pipes?

28. causes hoop tension in pipe shell.

29. The method of distribution of water is divided into how many types?

30. In which system of water supply, water is available for 24 hours but uneconomically used?

31. In which of the following units, design period is maximized?

32. Which of the following does not act as a major factor that effects per capita demand?

33. is used to measure the flow velocity across a cross-section with a known area.

34. In which system of water supply, water is supplied only during fixed hours of the day?

35. A hydel power project has been envisaged to serve the water supply and irrigation needs of the area at its inception stage. The dam reservoir so constructed is known as

36. The Clean Water Act (CWA) regulates

37. What is the full form of NTU in context with turbidity?

38. The discharge of regulated chemicals into surface waters is controlled by

39. is used to measure flows to domestic buildings.

40. The velocity of water in the pipe is 1.8m/Sec. What is the diameter of pipe used?

41. When depth of insertion of turbidity rod increases, the reading in the turbidity rod

42. The maximum amount of pollution that each waterway could absorb is known as

43. Which method is used to measure the color of water?

44. If the PO value is 6, what does it imply?

45. requires EPA to establish regulations to protect human health from contaminants present in drinking water.

46. Which reservoir is also known as Mitigation reservoir?

47. The amount of water required for 1 percent per day is determined as

48. A reservoir having gates and valves installation at its spillway and at its sluice outlets

49. Which of the following stress in pipe depends on temperature?

50. Pipe corrosion can be minimized by

Civil Engineering Mock Tests with Answers
Advanced Construction and Equipments Mock Test
Advanced Construction Technology Mock Test
Basics of Civil Engineering Mock Test
Building Construction Mock Test
Building Materials Mock Test
Building Services Mock Test
Building Technology and Architectural Planning Mock Test
Concrete Technology and Design Mock Test
Concrete Technology Mock Test
Construction Management Mock Test
Construction Project Management Mock Test
Construction Quality Control and Monitoring Mock Test
Construction Technology Mock Test
Design of Masonry Structures Mock Test
Design of Reinforced Cement Concrete Elements Mock Test
Design of Steel Structures Mock Test
Dock and Harbour Engineering Mock Test
Elements of Remote Sensing Mock Test
Engineering Geology Mock Test
Engineering Graphics Mock Test
Engineering Mechanics Mock Test
Estimating and Costing Mock Test
Estimation, Costing and Valuation Engineering Mock Test
Fluid Mechanics Mock Test
Foundation engineering Mock Test
Geotechnical Engineering Mock Test
Highway Engineering Mock Test
Hydraulics and Fluid Mechanics Mock Test
Hydraulics Machines Mock Test
Hydraulics Mock Test
Irrigation Engineering Mock Test
Maintenance and Rehabilitation of Structures Mock Test
Prefabricated Structures Mock Test
Professional Ethics in Engineering Mock Test
Public Health Engineering Mock Test
Railway Bridge and Tunnel Engineering Mock Test
Railway Engineering Mock Test
Railways, Airports, Docks and Harbour Engineering Mock Test
RCC Structures Design Mock Test
Societal and Global Impact Mock Test
Soil Mechanics and Foundations Mock Test
Structural Analysis Mock Test
Structural Design and Drawing Mock Test
Structural Design Mock Test
Structural Mechanics Mock Test
Surveying Mock Test
Waste Water Treatment Mock Test
Water Supply Engineering Mock Test
Water and Wastewater Engineerin Mock Test